The Oceannetworks.ca website, YouTube channel and Soundcloud channel contain many interesting audio highlight clips, which can be downloaded using the Search Hydrophone Data application.
Step-by-step guide
If, for example, you want to download the Clear Recording of Inner Coat Biggs Killer Whales clip, follow these steps:
- In the Audio Highlights page, find your clip of interest.
- Read in the description where the clip was recorded , for example: “This very clear recording was selected from over 40 minutes of vocalizations made by of a group of inner coast Biggs orcas near the Ocean Sonics icListen high frequency hydrophone deployed at 105m depth at our Folger Deep node.”
- Read the description for an individual clip, and find the Original Filename, for example: “ICLISTENHF1253_20140130T081956.935Z_20140130T082456.939Z”
Looking at this file name, you can find the hydrophone, date and time:- Hydrophone: ICLISTENHF1253
- Date: 2014-01-30
- Time: 08:19:56
- Knowing these things, open Search Hydrophone Data: https://data.oceannetworks.ca/SearchHydrophoneData
- Set the location, date and time as shown:
- For convenience, here's a direct link to that location, date and hydrophone: https://data.oceannetworks.ca/SearchHydrophoneData?LOCATION=27&DEVICE=23156&DATE=30-Jan-2014)
- After finding the date you want, scroll down to the time period of interest. Each spectrogram shown in the right part of the image is a 5-minute clip.
- Select the clip you want, then click the WAV checkbox and the Request Data button, as shown in this screen capture image:
- Wait for your request to be processed:
- After processing is finished, click the Download link:
- Your downloaded file will be a .zip file. Open it, then unzip the .gz file inside the .zip file to get your .WAV file:
Tip
You may find the volume level in the downloaded clip to be low. You can open your downloaded audio file in any audio editing software to amplify the volume.