The COASTAL DYNAMICS - FERRIES working group is composed of individuals and/or groups engaged in data analyses and the operations of the ONC: Strait of Georgia Ferries Monitoring Program. This community shares broad interests in measuring and understanding spatio-temporal variation of the physical, chemical and biological surface properties of the southern-central Strait of Georgia. 

The ONC: Strait of Georgia Ferries Monitoring Program currently maintains instruments onboard three BC Ferries routes (see map above) transiting between Vancouver Island and the mainland along: 1) the 'southern route' between Swartz Bay and Tsawwassen (F/V Spirit of Vancouver Island; started 2014); 2) the 'central route' between Duke Point and Tsawwassen (F/V Queen of Alberni; started 2012); and 3) the 'northern route' between Departure Bay and Horseshoe Bay (F/V Queen of Oak Bay; started 2015). Core measurements on each ferry include: 1) Sea-surface monitoring - salinity, temperature, dissolved oxygen, chlorophyll fluorescence, turbidity and coloured dissolved organic matter; and 2) Meteorological monitoring - wind speed/direction, air pressure, relative humidity and downward irradiation. Underway measurements are continuous and time- and location-stamped every 10 seconds. All data is available online in near real-time at  www.oceannetworks.ca.

The purpose of the working group is to provide a forum for: 1) regular updates on maintenance and sensor status for each of the instrumented ferries; 2) reports on any aspect of collected data; and 3) the discussion of new or ongoing issues, new project ideas, potential publications and  the addition of new instrumentation.

Documents:

Queen of Alberni_Ferry Maintenance Reports:

Spirit of Vancouver Island_Ferry Maintenance Reports:

Queen of Oak Bay_Ferry Maintenance Reports:

SeaKeeper Maintenance Logs:

Community Reports:

Other Documents: 

 

ONC Staff Scientists managing this group:
(contact one of us if you wish to become part of this working group) 

Profile picture
Userasastri@uvic.ca

Akash Sastri


This group is interested in:

 

 

 

 

User List
groupswg-coastal-dynamics-ferries

 

 

 

 

 

Recent Updates:

DateItem
Comments
07/07/2017QofA
  • Scheduled maintenance trip
  • Instrument cleaning and benchmarking
  • Discrete sampling for pCO2 sensor benchmarking
  • New QofA maintenance report uploaded
20/6/2017QofA
  • Scheduled maintenance trip
  • Instrument cleaning and benchmarking
  • New QofA maintenance report uploaded
14/6/2017QofOB
  • Scheduled maintenance trip
  • Instrument cleaning and benchmarking
  • New QofOB maintenance report uploaded
31/5/2017QofA
  • Scheduled maintenance trip
  • Instrument cleaning and benchmarking
  • Discrete sampling for pCO2 sensor benchmarking
  • SAS tracker height from water measurements
  • New QofA maintenance report uploaded
30/5/2017QofOB
  • Scheduled maintenance trip
  • Instrument cleaning and benchmarking
  • SAS tracker height from water measurements
  • Pump electrical connection inspection
  • New QofOB maintenance report uploaded
18/5/2017QofA
  • Scheduled maintenance trip
  • Instrument cleaning and benchmarking
  • New QofA maintenance report uploaded
11/5/2017QofOB
  • Scheduled maintenance trip
  • Instrument cleaning and benchmarking
  • New QofOB maintenance report uploaded
01/5/2017QofA
  • Scheduled maintenance trip / POD inspection - Ferry in dock for 2-3 day mini-refit
  • Benchmarks and cleaning
  • Inspect pCO2 membrane - new flow restrictor installed and measured flow to instrument
  • diver POD inspection - inspection report uploaded
  • New QofA maintenance report uploaded
21/4/2017QofOB
  • Scheduled maintenance trip
  • Instrument cleaning and benchmarking
  • Solve pump problem (System appeared to stop pumping April 15th – constant temperature)
  • New QofOB maintenance report uploaded
11/4/2017QofA
  • Scheduled maintenance trip
  • Benchmarks and cleaning
  • Inspect pCO2 membrane - new flow restrictor installed and measured flow to instrument
  • New QofA maintenance report uploaded
06/4/2017QofOB
  • Scheduled maintenenace trip
  • Instrument cleaning and benchmarking
  • Investigate low flow issues
  • New QofOB maintenance report uploaded
29/3/2017QofA
  • Scheduled maintenance trip
  • Benchmarks and cleaning
  • Swap a new CO2-Pro instrument for the previous failed one
  • New QofA maintenance report uploaded
22/3/2017QofOB
  • Instrument cleaning and benchmarking
  • Investigate trouble with SAS instrument s/n 003
  • New QofOB maintenance report uploaded
16/3/2017QofA
  • Scheduled maintenance trip
  • Benchmarks and cleaning
  • New air separator installed in-line
  • Install new power supply and RS485 Converters
  • New QofA maintenance report uploaded
2/3/2017QofOB
  • Scheduled maintenance trip
  • Benchmarks and cleaning
  • New QofOB maintenance report uploaded
1/3/2017QofA
  • Scheduled maintenance trip
  • Benchmarks and cleaning
  • New pyrgeometer and pyranometer installed upside
  • Troubleshoot ongoing issues with Vector GNSS and new SAS-tracker instrumentation
  • New QofA maintenance report uploaded
15/2/2017QofA
  • Vessel back in service
  • Instruments re-installed; includes new Pro-Oceanus pCO2 sensor
  • Bubbles observed in system on the Tsawwassen-Duke Point run - may be an external pod issue?
  • New QofA maintenance report uploaded
20/1/2017QofOB
  • Vessel returns to service
  • Instruments re-installed and running
2/12/2016QofOB
  • Vessel maintenance trip on 1/12/2016
  • New QofOB maintenance report uploaded
2/12/2016QofA
  • Vessel leaves service on 2/14. Instruments will be bench-marked and removed by 17/11
02/11/2016QofOB
  • Scheduled maintenance trip
  • New QofOB maintenance report uploaded
20/10/2016QofA
  • Scheduled maintenance trip
  • New QofA maintenance report uploaded
19/10/2016SOVI
  • Seakeeper system shut off. Instruments removed in anticipation of re-design between now and early 2017.
  • New SOVI maintenance report uploaded
15/10/2016General
  • All systems running with no major issues
15/10/2016SOVI
  • SOVI SeaKeeper instruments to be removed week of October 17, 2016 in anticipation of re-configuring the system during early 2017 when the ferry will be in dry dock

  • SOVI will be operating at reduced service during the winter

09/2016QofA
  • 5 regular maintenance trips since July 5, 2016
  • Recent pump failure and manifold clogging requiring future cleaning of POD
  • Data either poor or offline Aug 20-22, Aug 25-30, Sept 5-15
  • QofA in refit between Nov 18-Dec 6 (planned installation of Pro-Oceanus pCO2 sensor)
09/2016QofOB
  • 5 regular maintenance trips since July 14, 2016
  • 5 UVIC-Spectral lab trips since July 14, 2016
  • No major issues. Sampling for CDOM and calibration of SAS tracker continuing
09/2016SOVI
  • 4 regular maintenance trips since July 20, 2016
  • No major issues

Recent Scalar Plots:

Queen of Alberni (as of  )


Spirit of Vancouver Island (as of  )


Queen of Oak Bay (as of  )